The surface water drainage strategy incorporated permeable paving, with runoff collected and managed through the below-ground drainage network, whilst an attenuation tank was provided to manage surface water discharge, together with a Hydro-Brake flow control device.
The building was designed as a hot-rolled steel frame with masonry infill panels and wind posts, providing an efficient structural solution for the retail unit whilst also accommodating the requirements of the Subway unit. A ground floor slab solution was adopted, which incorporated localised recesses to accommodate freezer equipment.
The design of this had to be co-ordinated with the internal fit-out
requirements and structural arrangement.
News