In addition to the PV assessment, a general conditional survey of the existing structural frame was carried out to identify any defects, deterioration, or areas requiring remedial attention. Areas identified were then illustrated on a series of technical drawings, showing the remedial measures required.
The project also involved the infill of an existing pit and associated structural remedial works to the ground floor slab, following the removal of a redundant crane. These works ensured the integrity and continuity of the structural floor slab was preserved and restored the area for further use.