As this project involved the refurbishment of an existing industrial building; we were therefore constrained by the existing structural features of the building. Portland’s survey work was used to ensure any new members adequately fitted within the existing steel frame.
A new timber first floor was installed in the building, to ensure this was able to fit between the existing walls, Portland undertook a survey.
Portland Projects
News